Ming Hing Tai
  • 中文 (香港)
  • 中文 (中国)
  • Home
  • About Us
  • Services
    • Robot Cleansing and Environmental Management Project
    • Robot Cleansing of Sedimentation tanks and Sewers
    • Enterprise Thermal Imaging Drone Inspection Service
    • Construction and Maintenance Works of Oil Depot
    • Construction and Maintenance Works of Filling Station
    • Construction and Maintenance Works of LPG System
    • Fueling System Construction & Maintenance Project
    • Fuel Storage System Survey and 3D Infrared Professional Calibration
    • Internal Epoxy lining system for tanks
    • Double Wall Fibreglass Lining for tanks
    • Fuel Polishing Service
    • General Construction Work
    • Renovation Work
    • Waterproofing Work
    • Site Formation Work
    • Installation of loading arms
  • Job Reference
    • Robot Environmental Cleaning Works
      • Tank Cleansing and Environmental Management at Oil Terminal
      • 360°High-Pressure Cleaning and Environmental Treatment Project for the Fountain Water Storage Tank at The Hong Kong University of Science and Technology
      • 360°High-Pressure Cleansing and Inspection Works for Bleach Tank at Sewage Treatment Works
      • Robot Environmental Cleaning works for Digestion Tank No. 3 in Tai Po
      • Tank Cleansing Work with Robot and Environmental Management at Grease Trap in Tsing Yi Terminal
      • Robot Cleansing septic tanks at Stanley Prison
      • Robot Cleansing Work in Tseung Kwan O Industrial Estate
      • Tank Cleansing Work with Robot in Aberdeen Marina Club
      • Tank Cleansing work with Robot in FSD Venues & Oil depot
    • LPG Tank Demolition, Refurbishment & Lifting Works
      • Decommissioning UG Tank at Kwai Chung Crematorium
      • Decommissioning underground tank at Tsing Tim Street
      • Refurbishment and Inspection Works for Underground Fuel Storage Tank and Fuel Pipe System at Government Flying Service Headquarters
      • Refurbishment Works for UG Fuel Storage Tank at Government Flying Service Kai Tak Division
      • Refurbishment work for UG tanks at NT North Regional Police Headquarters
      • Refurbishment and Construction of LPG Tank at Sai Kung Station
      • Renovation Work for LPG Tank
      • Tank Lifting Installation Works
      • Replacement of Roof Plates for Vertical Tank
    • Service Station Demolition/Refurbishment/Construction Works
      • Decommissioning of Service Station in Tai Po Market
      • Refurbishment of Boundary Street Service Station
      • Construction of Petrol Filling Station in 3rd Runway – East & Landside Fire Station
      • Construction of Fuel Supply System of laundry room in Vogue
    • Epoxy Lining Auti-rust/Waterproofing Works
      • Anti-rust Epoxy lining on the bottom of vertical tanks in oil depot
      • Epoxy Waterproofing of depot water tank
    • Renovation of Hong Kong Sha Tau Kok Anti-war Memorial Hall
      • Reconstruction of concrete floors
      • Environmental Greening
      • Construction of surface channel
      • Design and decoration of interiors and exteriors
      • Painting and waterproofing Work
      • Air-conditioning and electrical work
      • Manufacture and repair of furniture
      • Installation of signage and foundation
    • Installation of Pipework for Biodiesel System
    • Renovation works of lubricating oil production line
    • Construction of Supporting and Service Site for Bus Depot
  • Maintenance Crew
  • Safety and Environment
  • Contact Us
  • Join Us
Home
Job Reference
Construction of Fuel Supply System of laundry room in Vogue

Construction of Fuel Supply System of laundry room in Vogue 

1.油缸安裝前準備工作

Preparation Work Before Tank Installation

2. 油缸吊裝工作

Installation of Fuel Tank

3.油缸吊裝工作完成

Completion of installation of fuel tank

3. 缸床回沙

Sand Backfilling to Tank Chamber

4. 回沙至油缸面水平

Sand Backfilling to Tank Sump Level

7.儲罐壓力測試

Pressure test to fuel tank

6. 安裝油缸井

Installation of Tank Sump

7. 安裝油喉

Installation of Nupi HDPE Pipe

8. 安裝油喉

Installation of Nupi HDPE Pipe

9. 油喉壓力測試

Pressure Test to Fuel Pipe

11

Construction of steel bar to tank chamber

12

Backfilling of concrete to tank chamber

10. 日用缸安裝

Installation of Daily Fuel Tank

11. 日用缸之喉管接駁

Pipe Connection of Daily Fuel Tank

12. 燃油監察系統安裝

Installation of ATG Console

home-logo3

Ming Hing Tai Construction Limited was established in 1995, specialising in a wide range of services including civil engineering construction, petrol filling station project and building maintenance, equipment installation, application for relevant licences, waste disposal and other services whereby earned a reputation of reliable management and quality output. During these successful years, the Company has grown in size from a handful of individuals to a full-sized, wide-ranging expertise of over 130+ experienced and competent staff, many of whom are technical professionals.

Information

About Us

Services

Job Reference

Maintenance Crew

Safety & Environment

Join Us

Contact Us

  • Unit 01, 33/F.,
    New Trend Centre,
    704 Prince Edward Road East, Kowloon, Hong Kong
  • +852 2325-6822
  • +852 2326-9793
  • info@mhtcl.com

Copyright © 2025 Ming Hing Tai Construction Limited. All rights reserved.