Ming Hing Tai
  • 中文 (香港)
  • 中文 (中国)
  • Home
  • About Us
  • Services
    • Robot Cleansing and Environmental Management Project
    • Robot Cleansing of Sedimentation tanks and Sewers
    • Enterprise Thermal Imaging Drone Inspection Service
    • Construction and Maintenance Works of Oil Depot
    • Construction and Maintenance Works of Filling Station
    • Construction and Maintenance Works of LPG System
    • Fueling System Construction & Maintenance Project
    • Fuel Storage System Survey and 3D Infrared Professional Calibration
    • Internal Epoxy lining system for tanks
    • Double Wall Fibreglass Lining for tanks
    • Fuel Polishing Service
    • General Construction Work
    • Renovation Work
    • Waterproofing Work
    • Site Formation Work
    • Installation of loading arms
  • Job Reference
    • Robot Environmental Cleaning Works
      • Tank Cleansing and Environmental Management at Oil Terminal
      • 360°High-Pressure Cleansing and Inspection Works for Bleach Tank at Sewage Treatment Works
      • Robot Environmental Cleaning works for Digestion Tank No. 3 in Tai Po
      • Tank Cleansing Work with Robot and Environmental Management at Grease Trap in Tsing Yi Terminal
      • Robot Cleansing septic tanks at Stanley Prison
      • Robot Cleansing Work in Tseung Kwan O Industrial Estate
      • Tank Cleansing Work with Robot in Aberdeen Marina Club
      • Tank Cleansing work with Robot in FSD Venues & Oil depot
    • LPG Tank Demolition, Refurbishment & Lifting Works
      • Decommissioning UG Tank at Kwai Chung Crematorium
      • Decommissioning underground tank at Tsing Tim Street
      • Refurbishment and Inspection Works for Underground Fuel Storage Tank and Fuel Pipe System at Government Flying Service Headquarters
      • Refurbishment Works for UG Fuel Storage Tank at Government Flying Service Kai Tak Division
      • Refurbishment work for UG tanks at NT North Regional Police Headquarters
      • Refurbishment and Construction of LPG Tank at Sai Kung Station
      • Renovation Work for LPG Tank
      • Tank Lifting Installation Works
      • Replacement of Roof Plates for Vertical Tank
    • Service Station Demolition/Refurbishment/Construction Works
      • Decommissioning of Service Station in Tai Po Market
      • Refurbishment of Boundary Street Service Station
      • Construction of Petrol Filling Station in 3rd Runway – East & Landside Fire Station
      • Construction of Fuel Supply System of laundry room in Vogue
    • Epoxy Lining Auti-rust/Waterproofing Works
      • Anti-rust Epoxy lining on the bottom of vertical tanks in oil depot
      • Epoxy Waterproofing of depot water tank
    • Renovation of Hong Kong Sha Tau Kok Anti-war Memorial Hall
      • Reconstruction of concrete floors
      • Environmental Greening
      • Construction of surface channel
      • Design and decoration of interiors and exteriors
      • Painting and waterproofing Work
      • Air-conditioning and electrical work
      • Manufacture and repair of furniture
      • Installation of signage and foundation
    • Installation of Pipework for Biodiesel System
    • Renovation works of lubricating oil production line
    • Construction of Supporting and Service Site for Bus Depot
  • Maintenance Crew
  • Safety and Environment
  • Contact Us
  • Join Us
Home
Job Reference
Design and decoration of interiors and exteriors

Renovation of Hong Kong Sha Tau Kok Anti-war Memorial Hall  

Design and decoration of interiors and exteriors 

1--_副本_副本

Before decoration work of showroom 3

2_副本

Completion of showroom 3 decoration

6

Completion of showroom 3 decoration

4_副本_副本

Before decoration work of showroom 4

5_副本

Completion of showroom 4 decoration

6--

Office decoration

4_2

Completion of office decoration

8-

Completion of corridor decoration

bcc06570-b0a4-4a3d-8649-0ff14220b2a0

Water Leakage

9

Replacement of Aluminum window

10-

Install window frame

11-

Completion of installation of aluminum window

12

Completion of installation of aluminum window

14-

Painting of Drain

15-

Design & Install drainage device

16-

Design & Install drainage device

17-_副本

Demolish the gate

18-

Refurbishment of the gate

home-logo3

Ming Hing Tai Construction Limited was established in 1995, specialising in a wide range of services including civil engineering construction, petrol filling station project and building maintenance, equipment installation, application for relevant licences, waste disposal and other services whereby earned a reputation of reliable management and quality output. During these successful years, the Company has grown in size from a handful of individuals to a full-sized, wide-ranging expertise of over 130+ experienced and competent staff, many of whom are technical professionals.

Information

About Us

Services

Job Reference

Maintenance Crew

Safety & Environment

Join Us

Contact Us

  • Unit 01, 33/F.,
    New Trend Centre,
    704 Prince Edward Road East, Kowloon, Hong Kong
  • +852 2325-6822
  • +852 2326-9793
  • info@mhtcl.com

Copyright © 2025 Ming Hing Tai Construction Limited. All rights reserved.